Supply agreement made for heavy-ion accelerator

2016-02-17

Sungsan E&C entered into a supply agreement with Institute for Basic Science(IBS) for two units of 80KW SSPA and one unit of 20KW at a frequency of 81.25MHz and four units of 20KW SSPA at a frequency of 325MHz for their heavy-ion accelerator.

IBS was established in November 2011 as Korea’s first dedicated basic science research institute to study the fundamental principles of nature.

The heavy-ion accelerator which IBS is currently designing and constructing will be the best in terms of acceleration energy, acceleration output and RI beam energy among the other accelerators in the world, which will be built by 2020 or already built.

The fact that Sungsan could get a supply contract for such a state-of-the-art technology clearly shows that Sungsan has such outstanding technology.

  • IBS Institute for basic science -

    IBS Institute for basic science

south Sungsan Electronic logo
Tel: +82-32-670-8510~2 | Fax: +82-32-670-8513 | A-1004, Daewoo-Technopark, 261, Doyak-Ro, Wonmi-Gu, Bucheon-City, Kyeonggi-Do, Korea